Projects

Projects > Luas Line

Back

Line A : Ansaldo / Alltec Fibre
Line B : Ansaldo / Alltec Fibre
Line C1 : Efacec / Alltec Fibre
Line B1 : Efacec / Alltec Fibre
Line A1 : Efacec / Alltec Fibre

Having been responsible for first Luas Line communication backbone, Alltec Fibre has worked on all subsequent Luas Lines and we are now currently working on the A1 Luas Line route. On the A1 line Alltec Fibre are responsible for all Communication Cabling and all Platform Electrical Installations and Platform Services.

Cable Installation: 95% External – 5% Internal

  • Approx. 100km of backbone cabling linking tram stops.
  • Approx. 60km of local power cabling feeding CCTV cameras, ticket vending machines, ticket validators, emergency phones, platform speakers, PIDS (Passenger Information Displays) etc.

 

Pictures: Alltec Fibre Staff terminating fibre and power into PID panels and adjusting CCTV camera.

Picture: Alltec Fibre Staff terminating power cables into the TVM (Ticket Vending Machine) Bases.

Picture: Alltec Fibre Staff terminating power cables into one of the cubicles on the A1 Line.

Pictures: Alltec Fibre Staff terminating power cables into one of the cubicles on the A1 Line and also a power and fibre panel for the PID inside the Advertising Drum.

Picture: Alltec Fibre Staff splicing fibre cables at a tram stop.

Picture: Alltec Fibre inspecting communications panel at Luas Light Rail cubicle.

Picture: Alltec Fibre Staff winching fibre cables along Luas Tram route.

Back