Projects

Projects > Dublin Airport

Back

Dublin Airport Campus Area Network / T2 Network: Mercury Eng / Alltec Fibre

The Dublin Airport CAN Project is the installation of a telecommunications Fibre & Copper infrastructure network around the campus of Dublin Airport.  This project involves the installation of approximately 50km of cable linking all the major comms rooms within Terminal 1, Terminal 2, DAA HQ, Hangar 6 etc.

Alltec is also currently finalising the following works on the new terminal 'T2' for at Dublin Airport for numerous contractors on site.

  • Baggage Handling System.
  • PA-AV Fibre Network.
  • PMS / MV Electrical Upgrade Fibre Network.
  • Airport Campus Backbone.
  • T2 Backbone
  • MSCP (T2 Multi Story Carpark)

Cable Installation:  60% External - 40% Internal

60 KM Approx Fibre / Copper backbone linking various buildings and comms rooms.

Picture: Alltec Fibre installed cables inside Dublin Airport Terminal 1.

Picture: Alltec Fibre installed cables externally linking all major buildings at Dublin Airport Campus.

Picture: Alltec Fibre operating Confined Space precautions while install cables at Dublin Airport Campus.

Picture: Alltec Fibre installed Fibre Optic backbone cables in one of the Hubs on the Dublin Airport Campus.

Picture: Alltec Fibre finished Fibre Optic backbone panels in one of the Hubs on the Dublin Airport Campus.

Picture: T2, one of the major buildings linked during the Dublin Airport CAN project.

Picture: Alltec Fibre Staff install cable at Dublin Airport.

Back