Intel Fab 24 : Mercury / Alltec Fibre
Intel Fab 24-2 : Mercury / Alltec Fibre
Intel IR6 : Mercury / Alltec Fibre
Intel Campus Network : Mercury / Alltec Fibre
Since 2002, Alltec Fibre has been involved with installing, terminating and testing fibre optic networks all over the Intel Campus.
Cable Installation: 70% External – 30% Internal
Intel Fab 24/2 Network Backbone: Mercury Engineering / Alltec Fibre
Latest Intel Fab building.
Cable Installation: 70% External - 30% Internal
35KM Approx Fibre / Copper backbone linking various buildings and comms rooms.
Terminations: 12000 Approx Fibre Terminations, ILM and OTDR Tests.